Week 07 – Accommodation

Big week. Lots of changes. Flooring, cabinets, and tile mostly in. Fingers crossed for a few key deliveries to come in on time during the next week so that we can finish on time. Still targeting Substantial Completion at the end of the month. I. The Kitchen It’s getting hard to keep track of what’s happened week to week, but I’m pretty sure on Monday, they laid a base coat of paint in the kitchen to get the final wall colorRead more

Week 06 – Beginning Finishes

Things are moving quickly now. After weeks of living with demolition and raw construction, we can start to envision how things will turn out as the finishes start going in. Last Saturday, the plumber installed tubing for the radiant floor, and Monday the tile installer came in to get the lay of the land. I spent part of the day laying out all the limestone flooring in our living room to get the grain and pattern right. Meanwhile, Charles and CraigRead more

Week 05 – Infrastructure

This week we passed all the rough inspections, and things are starting to move rather quickly. Kitchen cabinets arrive next Friday, so the pressure is on to install the radiant heat and finish flooring this week. One of the biggest changes this week was re-enclosing the kitchen, which was kind of odd after weeks of seeing through the bathroom into the kitchen. Charles installed continuous half-inch plywood as blocking for the cabinetry. Drywall will go on top this coming week. From AprilRead more